Outstanding Cape Ann Environmental News: Niles Pond and Brace Cove Causeway Restoration Underway

Niles Pond Brace Cove casueway restoration excavator ©Kim Smith 2014.The berm, or causeway, separating Brace Cove and Niles Pond is undergoing extensive maintenance.

The berm was severely damaged by a succession of storms, very notably after Superstorm Sandy. The causeway is also increasingly at risk because the Brace Cove breakwater has deteriorated, which means that the berm is harder hit during extreme weather.

Niles Pond Brace Cove casueway restoration excavator -3 ©Kim Smith 2014.Over time, the rocks that were used to build the causeway have gradually been swept into the pond. The excavator is permitted to scoop up the rocks from the Niles Pond side to rebuild the height of the causeway. No rocks from the Brace Cove side were used to restore the causeway.

Niles Pond Brace Cove casueway restoration excavator -3 ©Kim Smith 2014.The restoration of the berm is ecological progress at its best. By fortifying the causeway, the uniquely beautiful environment, where freshwater Niles Pond meets salty Brace Cove, will continue to remain a sanctuary for Cape Ann wildlife.

Niles Pond Brace Cove casueway restoration -2 ©Kim Smith 2014.

Niles Pond Brace Cove casueway restoration ©Kim Smith 2014The narrowest strip of land separating a body of fresh water from the sea.

2 thoughts on “Outstanding Cape Ann Environmental News: Niles Pond and Brace Cove Causeway Restoration Underway

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s