Thanks to the hard work and dedication of Phil Cucuru and Mike Tarantino, it appears as though the footbridge temporary bridge construction is complete. When we taped the podcast this morning, I was under the impression an inspection was required, which may be the case however, folks are using the bridge, and it looks perfect!
Covering storms back to back, I didn’t have time to post on both Good Morning Gloucester and on my blog. The following are links to storm posts from the region’s three March nor’easters, beginning on March 2nd.